Draft Environmental
Impact Report


Table of Contents

Executive Summary

1.0 Introduction

2.0 Project Description

3.0 Impact Analysis

3.1_Aesthetics

3.2_Air Quality

3.3_Biology

3.4_Cultural

3.5_Geology Soils

3.6_GHG

3.7_Hazards

3.8_Hydrology

3.9_Land Use

3.10_Noise

3.11_Public Services

3.12_Transportation

3.13_Tribal Cultural

3.14_Utilities

3.15_Energy

3.16_Wildfire

4.0_Cumulative Impacts

5.0_Alternatives

6.0_Other Environmental Considerations

7.0_Persons Consulted

8.0_Preparers

9.0_References

 Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Appendix F

Appendix G

Appendix H

Appendix I

Appendix J

Appendix K

Appendix L


NOTICE OF AVAILABILITY

Notice of Availability of Draft EIR


DRAFT EIR AVAILABILITY LOCATIONS

Draft EIR Availability Locations

Draft EIR Brochure

DEIR Public Meeting Presentation Slides


PUBLIC MEETINGS HELD DURING THE EXTENDED DRAFT EIR PUBLIC COMMENT PERIOD (DECEMBER 26, 2019 to MAY 31, 2020):

January 29, 2020 at 5:00pm - 7:00pm

Sunland – Tujunga Branch Library
7771 W Foothill Blvd, Tujunga, CA 91042

January 30, 2020 at 6:00pm - 8:00pm

Watts Senior Citizen Center
1657 E Century Blvd, Los Angeles, CA 90002

February 5, 2020 at 6:00pm - 8:00pm

Lafayette Multipurpose Community Center
625 S La Fayette Park Pl, Los Angeles, CA 90057

February 6, 2020 at 6:00pm - 8:00pm

Reseda Recreation Center
18411 W Victory Blvd, Reseda, CA 91335

February 12, 2020 at 6:00pm - 8:00pm

Westchester Senior Citizen Center
8740 S Lincoln Blvd, Los Angeles, CA 90045

February 13, 2020 at 6:00pm - 8:00pm

Normandale Recreation Center
22400 S Halldale Ave, Torrance, CA 90501

February 15, 2020 at 10:00am - 12:00pm

Robert Louis Stevenson Branch Library
803 S Spence St, Los Angeles, CA 90023

Although the Draft EIR Public Review and Comment Period has ended, the entire Draft EIR is available online at the above links.